At KPM, we design pneumatic conveying systems ensure quality systems for your production warehouse. Pneumatic systems safeguards materials from open environments by utilizing air to do so. The systems avoids spillages and contamination. Using pneumatic conveying systems ensures environmental control, machine reliability, increases efficiency, prevents contamination and overall complies with OH&S standards.

Onsite trial & Installation of Vacuum Conveying

Pneumatic Conveying snapshot1
From site survey to start-up
A pneumatic conveying system is only as good as the engineering behind it. Klausen Process Machinery provides a complete design and installation service, taking your project from the first site survey and material assessment through layout, pipe routing, fabrication, installation and commissioning. One team is responsible for the result, so the system that is drawn is the system that is built and proven with your product.
This page explains how our design and installation service works. If you would like an overview of the equipment itself, including dilute phase, dense phase, vacuum and pressure systems, visit our pneumatic conveying products page.
01Our 6-step pneumatic conveying design and installation process
- Site survey. We visit your plant to understand pick-up and delivery points, building constraints, services and how the line will be operated and cleaned.
- Material assessment and testing. We review your powder's properties and, where needed, arrange trials so the design is based on real behaviour.
- Concept and sizing. The conveying method, air mover, feeding device, pipe size and receiver are selected to meet the required rate.
- Layout and pipe routing. General arrangement drawings show equipment positions and the pipeline route, supports and access.
- Installation. Equipment is fabricated, delivered and installed by technicians who understand the design intent.
- Commissioning and training. The system is proven with your product at rate, tuned and handed over with operator training.
02Step 1: the site survey
Many pneumatic conveying problems start with assumptions about the site. A survey lets our engineers measure actual distances and heights, identify obstacles such as beams, ducts and walkways, and confirm where power, compressed air and dust extraction are available. We also look at how material arrives, whether in sacks, bulk bags, IBCs or tankers, and where it needs to go: mixers, silos, hoppers or packing machines.
Just as important is how people will use the system. We discuss cleaning frequency, product changeovers, allergen management and maintenance access so the final layout works for operators as well as for the process.
03Step 2: material assessment and testing
The material decides almost everything in pneumatic conveying design. Bulk density, particle size and shape, moisture content, temperature, abrasiveness, friability and cohesiveness all influence the air velocity, the choice between dilute and dense phase, the pipe diameter and the type of filter receiver required.
- Fragile products such as agglomerated or coated granules may need lower velocities to limit breakage.
- Abrasive minerals call for careful velocity control and wear-resistant bends.
- Blended products must be conveyed in a way that limits segregation of components.
- Hygroscopic or sticky powders may need conditioned air or special attention to receiver and filter design.
- Combustible dusts require earthing, bonding and explosion protection to be considered from the outset.
Where the behaviour of a powder is uncertain, a conveying trial or on-site test with a temporary vacuum unit can confirm the approach before the full system is built. It is far cheaper to learn from a trial than to modify an installed line.
04Step 3: concept design and sizing
With the survey and material data in hand, we prepare a pneumatic conveying concept that meets your required transfer rate with sensible margins. This stage defines whether the line will use vacuum or pressure, dilute or dense phase, and how material will be introduced into the airstream, for example via a rotary valve, bag tip station, bulk bag unloader or pick-up point. Our guide to vacuum vs pressure pneumatic conveying explains the trade-offs in more detail.
You receive a clear proposal that sets out the scope, the main equipment, the assumptions behind the design and a budget, so you can make an informed decision and compare options. If your plans are still evolving, we can price alternatives side by side, such as a single multi-point line versus separate smaller conveyors.
05Step 4: layout and pipe routing
Routing is where good pneumatic conveying design really shows. Every bend adds resistance and wear, every vertical lift adds load, and every horizontal run must be supported at the right spacing. Our design and layout team produces general arrangement drawings that show the pipeline route, bend positions, supports, diverter valves and access platforms.
Routing principles we follow
- Keep the route as short and direct as practical, with the fewest possible bends.
- Use long-radius bends or wear-resistant bends where the material is abrasive.
- Avoid bends immediately after the pick-up point so material can accelerate.
- Provide clean-out points and quick-release couplings for inspection and cleaning.
- Support pipework independently of equipment so load cells and flexible connections are not stressed.
- Allow safe access to receivers, filters and valves for maintenance.
06Step 5: fabrication and installation
Once drawings are approved, equipment and pipework are fabricated and checked before delivery. Our technicians then install the air mover, feeding device, pipeline, receiver, filters and controls in line with the design. Because the installers understand why each detail was chosen, small site variations can be resolved without compromising performance.
We plan installation to minimise disruption to production, coordinating with your project team, site safety requirements and electrical contractor. Existing plants can often be upgraded in stages, replacing manual handling one area at a time.
07Step 6: commissioning and handover
Commissioning proves that the pneumatic conveying system meets its design. We check air flows and pressures, conveying rates, cycle times, filter cleaning and level signals, then convey your actual product and fine-tune settings until transfer is consistent and clean. Operators and maintenance staff are trained on safe operation, cleaning, routine checks and troubleshooting, and settings are recorded for future reference. Learn more about our installation and commissioning service.
Controls and automation
A pneumatic conveying line is usually part of a larger automated sequence. We define how the conveyor starts and stops, how receivers signal when they are full, how filters are pulsed clean and how the system responds to a blockage or low air pressure. Diverter valves can route material to several destinations, and level probes or load cells can call for material only when it is needed. Clear interlocks protect operators during cleaning and maintenance, and simple operator screens make it easy to see the status of the line at a glance.
08Safety and compliance in pneumatic conveying design
Many powders conveyed in food, chemical and plastics plants are combustible. A well-engineered pneumatic conveying installation addresses earthing and bonding, ignition sources, venting or suppression of receivers and isolation between process areas. Sites handling these materials should review AS/NZS 4745 Code of practice for handling combustible dusts as part of their risk assessment, and we design our systems to support that process.
Replacing manual bag lifting and scooping with automated conveying also reduces hazardous manual tasks and operator exposure to dust, two of the most common reasons customers start a project with us.
09Typical pneumatic conveying projects
Our design and installation service covers everything from a single vacuum transfer to a multi-point line serving several process areas. Common projects include:
- Conveying ingredients from a bag tip station into a mixer on a mezzanine.
- Transferring powder from bulk bag unloaders into silos or day bins.
- Refilling loss-in-weight feeders automatically so dosing never stops.
- Delivering finished blends from a mixer to a packing or auger filling machine.
- Replacing forklifts and buckets used to move product between buildings or floors.
Each of these jobs looks simple on paper, yet each has its own challenges: limited headroom, long horizontal runs, sanitary requirements or products that must not segregate. Treating the conveyor as part of the wider process, rather than a stand-alone item, is what makes these projects successful.
Information that helps us quote
You will get a faster and more accurate proposal if you can share a few details at the start:
- Product name, safety data sheet and a description of how it flows.
- Required transfer rate and hours of operation.
- Approximate horizontal distance, vertical lift and number of direction changes.
- How the material is supplied and what it feeds into.
- Photos or drawings of the area, including ceiling height and obstacles.
10Why choose KPM to design and install your system
- One accountable team for survey, design, manufacture, installation and commissioning.
- Whole-line thinking, because we also supply bag tip stations, bulk bag unloaders, feeders, mixers and fillers that connect to the conveyor.
- Local support from our base in Kings Park, Sydney, for sites across Australia and New Zealand.
- Practical layouts that consider cleaning, access and future expansion, not just the conveying calculation.
11Pneumatic conveying design and installation FAQs
Do you need to visit my site?
For most projects a site survey is the best way to get the design right. For simple systems we can sometimes start from drawings, photos and measurements you provide.
Can you test my powder before designing the system?
Yes. Material assessment is part of our pneumatic conveying design process, and trials can be arranged where the behaviour of a product is uncertain.
Can a new system be added to an existing plant?
Yes. Conveying lines are well suited to retrofits because pipework can be routed around existing equipment, and installation can be staged to limit downtime.
Will you train our operators?
Yes. Training on safe operation, cleaning and routine maintenance is included as part of commissioning and handover.
Ready to automate powder transfer in your plant? Contact Klausen Process Machinery to book a site survey and discuss your pneumatic conveying design and installation project.

Bag tip stations
Bulk bag systems
Pneumatic conveying
Loss-in-weight feeders